Start with the transaction workflow
Define who uses the terminal, how payment is initiated, which application and payment service are involved, and what should happen when a transaction is interrupted. A board reference does not establish payment approval or suitability for a finished terminal.
Freeze the hardware requirements
Record the model and PCB revision proposed by the supplier. Specify processor workload, memory and storage, displays and touch, camera, readers, printer, cash drawer, serial interfaces, USB and network. Confirm connector pinouts, electrical levels, isolation and peripheral power requirements using controlled drawings.
Define power and recovery tests
Test the actual supply, enclosure, cable lengths and peripheral combination. Include printer startup, radio activity, backlight changes, network loss, power interruption and recovery. Record boot behavior, application restart, transaction reconciliation and any limitations. Agree the acceptance criteria before running a sample test.
Assign software and security ownership
Confirm the BSP and firmware build, driver scope, application permissions, launcher behavior, provisioning, update signing and rollback. Identify who maintains the OS and payment application, receives vulnerability reports and approves a release. A processor feature or webpage statement does not establish a secure finished product.
Request the evidence
Request current model specifications, interface definitions, firmware release information and applicable reports. Match each document to the model, PCB, radio, power supply and software configuration. Distinguish board documentation, module evidence and finished-terminal requirements. Record unresolved items instead of assuming a certificate applies to every variant.
Approve the pilot and commercial scope
Keep the sample identity, setup, test procedure, results and deviations together. Agree substitutions, change notices, maintenance and end-of-support responsibilities. Confirm sample policy, price, quantity, development charges, delivery and warranty in writing; no fixed delivery time or supply duration is promised by this guide.
Review document availability and send the engineering requirements before a procurement decision.

